The longest bridge in SE Asia was opened in March 2020 utilising OSD products in it’s video surveillance system. Over 250 units of OSD225x series of products were used in multiple redundant rings to provide the fiber backbone for high definition video surveillance along this 30km bridge. OSD worked closely with our Singapore distributor Interactif Video Systems in providing this solution. The OSD2251P were used to connect to the IP cameras and the OSD2254 provided the connection to the core network. OSD’s range of Industrial Ethernet products are designed to operate in Brunei’s climate of high temperatures and high humidity.
In July 2020, the bridge was renamed Sultan Haji Omar Ali Saifuddien Bridge.