The 4.8km South Road Superway (North South Motorway M2) was completed in March 2014. South Australia’s first elevated roadway is the biggest single investment in a South Australian road project, and the state’s most complex engineering road construction project to date.
OSD supplied the fiber optic transmission equipment for the interfacing the Intelligent Traffic System (ITS) with the core backbone network. The OSD products were used for the applications as shown below:
OSD157 – Lane use management systems (lums)
OSD138 – Variable message signs (VMS)
OSD2041 – Traffic Detection
OSD8815 – Fixed Analog Cameras
OSD8816 – PTZ Analog Cameras
With most of these products installed in road side cabinets, it was very important that these products be rated to +75degC.